Guides
First article inspection, explained plainly.
Practical guides for quality managers and inspectors doing AS9102 first articles at job shops. No fluff, and free templates where they help.
Forms
AS9102 Form 3 explained, with a free Excel template
What goes in each column, how to record results, and the mistakes that get reports sent back.
Read the guide → BallooningHow to balloon an engineering drawing
What to balloon, how to number it, and how to handle multipliers, GD&T, notes and revisions.
Read the guide → StandardsAS9102 Rev C: what changed from Rev B
What stayed the same, what changed on the forms, and what to do about it.
Read the guide → ProcessFull vs partial FAI: when each applies
The events that trigger a new FAI, worked examples, and how to document a partial FAI.
Read the guide → SubmissionUploading FAI data to Net-Inspect: what to prepare
The data, documents and checks to have ready before you submit a first article.
Read the guide → Free downloadAS9102 Form 1, 2 and 3 Excel templates
Free, laid out to the Rev C field numbering, ready to print.
Get the templates →Let the AI do the ballooning.
Upload a drawing to the free ballooner and get every characteristic numbered, with Form 3 pre-filled.